Case Study: How XYZ Construction Reduced Documentation Time by 60%

Learn how a leading construction company transformed their site documentation workflow using Gaussian Splatting and achieved remarkable efficiency gains.

Splat Labs TeamJanuary 2, 30006 min read
Case Study: How XYZ Construction Reduced Documentation Time by 60%

Project Overview

XYZ Construction, a leading commercial construction firm, faced significant challenges with their traditional site documentation process. Manual photography, 2D drawings, and written reports consumed hundreds of hours per project and often failed to capture the full context of construction progress.

In 2024, they partnered with Splat Labs to implement a Gaussian Splatting-based documentation workflow across their portfolio of active projects.

The Challenge

Before implementing Gaussian Splatting, XYZ Construction's documentation process faced several pain points:

  • Time-intensive: Documentation required 15+ hours per week per project
  • Incomplete coverage: 2D photos missed critical spatial relationships
  • Version control issues: Tracking changes over time was difficult
  • Client communication: Explaining progress to stakeholders required in-person visits

"We were spending more time documenting our work than actually doing it. Something had to change."

— Sarah Chen, Project Manager, XYZ Construction

The Solution

XYZ Construction implemented a three-pronged approach using Splat Labs technology:

1. Weekly Capture Protocol

Field teams were equipped with PortalCam devices and trained on optimal capture techniques:

  • 10-minute captures per floor
  • Standardized path routes for consistency
  • GPS-tagged imagery for spatial accuracy

2. Cloud Processing and Storage

All captures were automatically uploaded to Splat Labs Pro for processing:

  • Same-day turnaround on splat generation
  • Automatic 4D timeline compilation
  • Secure cloud storage with unlimited retention

3. Stakeholder Access Portal

Clients and team members gained access to interactive splat viewers:

  • Browser-based viewing (no software required)
  • Measurement tools for quantity takeoffs
  • Annotation capabilities for issue tracking

Results

After six months of implementation, XYZ Construction measured the following improvements:

MetricBeforeAfterImprovement
Documentation time15 hrs/week6 hrs/week60% reduction
Client site visits4 per month1 per month75% reduction
Issue resolution time5 days avg2 days avg60% faster
Rework incidents12 per project4 per project67% reduction

Key Takeaways

Based on XYZ Construction's experience, here are the key factors for successful implementation:

  1. Start with a pilot project: Test the workflow on a single project before company-wide rollout
  2. Invest in training: Proper capture technique is essential for quality results
  3. Establish clear protocols: Standardized processes ensure consistency
  4. Engage stakeholders early: Client buy-in accelerates adoption

What's Next for XYZ Construction

Building on their success, XYZ Construction plans to expand their Gaussian Splatting usage:

  • Integration with BIM workflows for clash detection
  • AI-powered progress tracking automation
  • Virtual reality training for safety protocols